Well Completion and Workover (PRC-2)
Tanggal
12-14 Agustus 2009
Jam Pelaksanaan
08.30-17.00 WIB
Tempat
Papandayan Hotel
Bandung
Pembicara / Fasilitator
Ir. Tutuka Ariadji, M.Sc, Ph.D
Ir. Boedi Windiarto
Harga
Rp.5.250.000,-
per participant, excluding accommodation & tax.
OBJECTIVES
This course introduces the participants to the concepts of completions and workover designs. It introduces the participants to the common completion and stimulation methods and the associated oil field equipments.
COURSE CONTENT
1. Introduction
Basic Terminology
Introduction to Geology
Well Planning
2. Well Planning
Drilling
Pay Section
Initial Completion Design
3. Casing Design
Completion the Pay Zone
Casing String Design
Liner Design and Tie-Backs
4. Cementing
Properties of Typical Cements
Cementing Design
Primary Cementing
5. Packer Selection
Packer Types
Packer Selection and Tubing Forces
Special Packers
6. Well Head, Chokes and SSSV’s
Wellheads Subsea Wellheads
Subsurface Safety Valves and Chokes
Hydrate Control
7. Corrosion and Erosion
8. Inflow Performance and Artifical Lift
9. Perforating Guns and Design
WHO SHOULD ATTEND
Production and completion engineers, general petroleum engineers, reservoir engineers, operation engineers, geologist, geophysicists, supervisors, technical managers, and field foremen.
cforms contact form by delicious:days
Di akses dari kata kunci : workover string design trainingEvent lainnya :
- CENTRIFUGAL PUMP OPERATION AND MAINTENANCE CENTRIFUGAL PUMP OPERATION AND MAINTENANCE Tanggal 14-17 November 2011 Pukul...
- Geothermal Well Drilling Planning for Non Engineer Geothermal Well Drilling Planning for Non Engineer Tanggal 21 –...
- Well Completion And Work Over Well Completion And Work Over Tanggal 30 Januari – 3...
TAG
Casing String Design, Corrosion and Erosion, Drilling, general petroleum engineers, operation engineers
Navigasi Jadwal
Diposting tgl : July 30th, 2009 | Sudah dibaca 873 kali.















