PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FOR PETROLEUM PRODUCTION SYSTEM
PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FOR PETROLEUM PRODUCTION SYSTEM
SASARAN TRAINING :
Setelah menyelesaikan kursus ini diharapkan peserta dapat :
- Memahami prinsip-prinsip dasar perhitungan reservoir minyak bumi yang berhubungan dengan penggunaan gas-lift, sucker-rod, electric submersible, hydraulic dan jet pump.
- Melakukan diagnosis sederhana dan memengerti pengelolaan data sumuran minyak yang diproduksi dengan, gas lift, sucker rod pumping, electric submersible, hydraulic dan jet pump.
- Membuat analisis sederhana terhadap data sumuran minyak, melakukan perhitungan-perhitungan kinerja sumuran sebagai hasil dari pemompaan dengan berbagai metoda sesuai dengan keadaan reservoirnya.
- Melakukan perhitungan-perhitungan kuantitatip sederhana dan melakukan optimisasi produksi untuk sumuran minyak yang diproduksi dengan gas lift, sucker rod pumping, electric submersible, hydraulic dan jet pump sesuai dengan batasan operasinya.
PRE-REQUISITE :
Latar belakang : Operator/Sr. Operator/ Jr.Engineer/Engineer
CAKUPAN MATERI TRAINING :
1. SISTEM PRODUKSI LAPANGAN MINYAK BUMI
a. Sistem Produksi Alamiah
b. Sistem Produksi Dengan Pengangkatan Buatan
2. GAS LIFT
a. Pendahuluan
b. Gas Lift Continu dan Intermittent
c. Komponen Alat Utama Gas Lift
d. IPR dan Perancangan Gas Lift
e. Optimisasii dan Alokasi Gas untuk Gaslift
f. Sistem Produksi Dengan Pengangkatan Buatan oleh Gas Lift
3. SUCKER ROD PUMP
a. Pendahuluan
b. Pump Intake Curve
c. Optimisasi Produksi
d. Rancangan Sucker Rod Pump API RP11L
e. Komponen Alat Utama
f. Faktor-faktor yang mempengaruhi gerakan rod
g. Perencanaan pompa
h. Dynagraph & Dynamometer
4. PCV (PROGRESSIVE CAVITY PUMP)
a. Pendahuluan
b. Deskripsi Peralatan
c. Elastomer
d. Perancangan
5. ELECTRIC SUBMERSIBLE PUMP
a. Pendahuluan
b. Dasar-dasar perhitungan ESP
c. Konstruksi ESP
d. Karakteristik pompa SRP
e. Cara Memilih jenis pompa
f. Aplikasi di Lapangan
6. POMPA HIDRAULIK
a. Alat-alat permukaan
b. Jenis-jenis unit pompa
c. Jenis-jenis unit pompa
d. Ukuran pompa
e. Langkah-langkah pada pemilihan pompa hidraulik
7. POMPA JET
a. Pendahuluan
b. Persoalan gas
c. Ukuran Nozzle dan throat
d. Langkah-langkah pada perhitungan Jet pump
e. Grafik Kelakuan pompa
f. Menggunakan program mesin hitung
g. Hasil lapangan
INSTRUKTUR :
Ir. Sudiharto, MT. and Team
TEMPAT TRAINING :
Hotel Golden Flower Bandung
DURASI TRAINING :
5 days
WAKTU TRAINING :
18 – 22 Oktober 2010
HARGA INVESTASI/PESERTA :
1. Rp 7.450.000/person (full fare) or
2. Rp 7.250.000/person (early bird, payment before 11 October 2010) or
3. Rp 6.950.000/person (if there are 3 persons or more from the same company)
FASILITAS UNTUK PESERTA :
- Training Module
- Training CD Contains Training Material
- Certificate
- Stationeries: NoteBook and Ballpoint
- Jacket or Waistcoat or T-Shirt
- Bag or Backpackers
- Training Photo
- Training Room with Full AC Facilities and multimedia
- Once lunch and twice coffeebreak every day of training
- Qualified instructor
- Transportation for participants from hotel of participants to/from venue of training(if minimal number of participants from one company is 4 persons)
TRAINING INSTRUCTOR
Ir. Sudiharto, MT, is alumnus from Bandung Institute of Technology (ITB) department of petroleum engineering. Ir. Sudiharto besides as instructor and researcher at Geothermal Laboratory ITB, he is also being as Production Engineer at LAPI ITB, Production & Reservoir Analist and expert board (Dewan Pakar) at Forum Komunikasi Daerah Penghasil Migas, and joining in Community Development Team Dirjen Migas since 2003.
Some projects have been handled by him such as policy analysis expert on oil and gas subsector, oil and gas production expert, and field economicity such as: projection study investation potency energy and mineral resources, implementation study national energy consumtion, study on field use of Brownfield in Indonesia, inventarization research of old well potential in regency of Muaro Jambi, blueprint arrangement manpower on oil and gas subsector, development operation cost estimation system oil and gas: geological and geophysical stage, study of combustion flare gas at PERTAMINA DOH Jawa Bagian Barat, survey and development of GIS based datas for planning and distribution BBM and transportation gas through pipe, study on planning of Indonesia – Asean pipeline system, etc. Ir. Sudiharto have trained for training class for many companies in Indonesia. Some topics that have been frequently delivered by him as follows :
- Electric Submercible Pump, Problem and Trouble Shooting Mecanism
- Crude Oil Analysis
- Drilling, Production and Workover Strategy
- Well Workover and Completion Stretegy
- Petroleum Finance, Acconting and Reservoir Management
- Plan of Development in Oil and Gas Industries
- Pressure Control for Drilling Engineer
- Plan of Development (POD) & Authorization For Expenditures (AFE)
- Management Skills Secretary Petroleum Gas and Oil Industries
- Pressure Transient Analysis and Well Testing Data Interpretation
- Oil Production System and Operation
- Formation Damaged and Well Stimulation
- Simulasi Reservoir for Petroleum Engineer
- Oil and gas transportation/measurement, etc
cforms contact form by delicious:days
Di akses dari kata kunci : data-data untuk pompa sucker rod, harga pompa lift pump, penggunaan progressive cavity pump, perhitungan dasar penentuan besarnya pompa summersible, perhitungan design sucker rod pump, perhitungan penggunaan lift, proses pengankutan minyak dengan menggunakan pompa gas lift, ulasan tentang pompa sucker rod pumpEvent lainnya :
- Basic Petroleum Engineering (Petroleum Engineering For Non Engineer) Yogyakarta Basic Petroleum Engineering (Petroleum Engineering For Non Engineer) Yogyakarta Tanggal...
- OIL AND GAS PRODUCTION INSTRUMENTATION AND MEASUREMENT OIL AND GAS PRODUCTION INSTRUMENTATION AND MEASUREMENT Tanggal dan Tempat...
- GPS (Global Positioning System) for mining and Petroleum: Principles, equipment, data collecting, data processing, and Application GPS (Global Positioning System) for mining and Petroleum: Principles, equipment,...
TAG
Alokasi Gas untuk Gaslift, Cara Memilih jenis pompa, ELECTRIC SUBMERSIBLE PUMP, Gas Lift, Gas Lift Continu dan Intermittent, IPR dan Perancangan Gas Lift, Ir. Sudiharto, Komponen Alat Utama, PCV (PROGRESSIVE CAVITY PUMP), pompa SRP, PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FOR PETROLEUM PRODUCTION SYSTEM, Pump Intake Curve, SISTEM PRODUKSI LAPANGAN MINYAK BUMI, Submersible Pump, SUCKER ROD PUMP
Navigasi Jadwal
Diposting tgl : October 12th, 2010 | Sudah dibaca 1046 kali.











